Blossom Close
Project Type
Mechanical
Date & Duration
Mar 2026 - 4 Months
Financial Value
£60,000
Client
Harkmac

We delivered the full plumbing and hot water package across three new build homes at Blossom Close, Luton, including first and second fix pipework, complete bathroom and en-suite suites, and new unvented cylinders. Each property was also fitted with its own domestic air source heat pump (ASHP), providing space heating and hot water from a single low-carbon system.
The main challenge was space. Heat pump installations require more kit than a traditional gas system — cylinder, expansion vessels, controls and additional valves — and the plant cupboards on site were compact, with every millimetre of pipework taking storage away from the tenants. We planned the layout before running a single pipe, choosing a slimline cylinder, stacking components vertically and grouping valves into one accessible service zone. The result is a neat, fully serviceable installation that leaves usable storage space behind.
Services
- Installation of new sanitaryware & kitchen
- New plumbing installation
- Installation of domestic ASHP
- Chemical Dosing
- Installation of UFH manifolds & cylinder cupboard
- Installation of new bathrooms